From first order to final handover
— and every shift after.

Projects, materials, documents, completions and maintenance on one connected equipment record.

ANA-MS Projects dashboard

01 / HOW IT FITS TOGETHER

Two pathways. One equipment record.

Projects build it. Maintenance runs it. ANA-MS keeps every tag’s history in one place, so what was installed, tested and handed over is exactly what Operations inherit.

Projects & Completions

One equipment record

Maintenance & Operations

02 / PROJECTS & COMPLETIONS

Know exactly where every system stands.

Subsystems & gates

Gated completions from mechanical completion to handover. A gate only issues when its checksheets are signed and its punch is clear.

Punch lists

Category A, B and C punch raised against the right tag, with clear owners, so blockers show up before they hold up a gate.

Walkdowns

Capture punch on site against the right tag, so nothing gets lost between the walkdown and the punch list.

Handovers

Hand systems to Maintenance with the full record attached: signed checksheets, punch and documents, ready to accept.

The readiness critical path: which subsystems wait on which, how much work is left before each gate, and what is holding up the most.

Every subsystem and every gate, from mechanical completion to handover, at a glance.

03 / MAINTENANCE & OPERATIONS

One shared picture for the people running the plant.

Equipment history

Every defect, repair and change on a tag, alongside its build and commissioning record.

Operating status

See what is running, on standby, isolated or out of service, and which critical equipment is not available.

Defects

A closed defect loop: anyone can raise it, Maintenance fixes it, Operations confirms it back in service.

One shared picture of equipment status and defects for maintenance and operations.

04 / THE SHARED FOUNDATION

One set of records, used by both sides.

REGISTERS

Equipment register

One record per tag, from construction through operation.

Hazardous area register

Hazardous-area equipment recorded against each tag and zone, with Ex inspection status tracked.

Override register

Every override logged with an owner and a time limit, with overdue overrides flagged.

WORK

Tasks & Task Packs

Plan and allocate tasks, and print Task Packs for technicians in the field.

COMMERCIAL & DOCUMENTS

Purchase orders

Track POs and vendor deliverables against the equipment they supply.

Document control

Revision-controlled documents linked to tags, with site mark-ups tracked back to the master copy.

05 / BUILT FOR HOW SITES WORK

Vendor & subcontractor access

Their own logins, showing only their tasks.

Ask ANA

Ask questions of your project data in plain English.

Live dashboards

Progress, blockers and what is next, filtered your way.

06 / SECURITY BY DESIGN

Built for secure industrial work

Multi-factor authentication

Encryption in transit and at rest

Built around UK data protection

Your data stays yours. The client owns the data.

YOUR PROJECT. ONE CONNECTED SYSTEM.

See ANA-MS on your project